13
Mar.Hong Kong Environmental Protection Department has built the first artificial "Super incinerator" island off Shek Kwu Chau, and built municipal solid waste incineration and power generation facilities on the island. This is the first waste-to-electricity conversion project of the new-generation waste incinerator in Hong Kong. It is also the first black start system synchronised with the large-scale steam turbine power generation system in Hong Kong, with an annual output of about 480 million KWH of electricity. To produce enough electricity to power 100,000 homes.
Read More15
Dec.3Tech delivered an ISO40HC style DataCage to Maldives recently. In order to protect the environment and minimize the potential disturbance and damage to the world heritage site, 3Tech DataCage was selected because it is fully equipped and tested in factory before delivery to site. Customer only need to connect the server and the data centre is ready to go.
Read More24
Feb.Before end of 2021, 3Tech delivered 18 sets of large capacity (5000A and 6000A) 48V DC power systems to a Pilipino Teleco company to be installed in their major facilities in Manila. Some of them are used in data centre for large scale external data communication while others are installed in their telephone exchange centre. This was in addition to another 36 smaller capacity upto 1500A order received earlier.
Read More23
Feb.MWC Barcelona is just around the corner, 3Tech is excited and cannot wait to meet people and make networking connections with entrepreneur from the industry. 3Tech is presenting a series of power system products to serve various digital products including:
Read More2
Dec.3Tech supplied 13 (12+1) 2200kW 11kV standby generator systems for the Huizhou Tonghu Data Centre Phase 1. Phase 1 will be completed in 2021 and Phase 2 in 2022. Once completed, the data centre area is over 45,000 square metre. This data centre is designed according to the highest Class A requirements of China Data Centre GB standard.